01 Dec, 2022
Over 7t of green waist removed from this very steep site. SM Responder and lots of men.
30 Nov, 2022
Emergency job to extract 10 x 1.4 tonne irrigation motors from the flooding Murray River. SM Responder, 2 x modular dumb barges (total capacity of 55 tonne) and 8 tonne excavator all brought on site for a successful job.
By getting ready for another Job!! 30 Nov, 2022
17 Oct, 2022
Over 2.5 tonne of ballast rock, gravel and top grade top soil brought in with SM Responder.
17 Oct, 2022
Down the swollen Hunter River to the newcastle yacht club. Out of the water to go to a holding yard. New spud brackets welded on and sit tight for job in Merimbula.
14 Oct, 2022
Complete rebuild. New piles and hardwood decking. October 2022.
14 Oct, 2022
Working alongside Dragonfly Environmental. September 2021.
13 Oct, 2022
August 2022. Huddo on the tools......... nice work mate!!